A Simulation-Based Dynamic Scheduling Model for Curtain Wall Production Considering Construction Planning Reliability

Kim, Taehoon; Kim, Yong-Woo; Cho, Hunhee. (2021). A Simulation-Based Dynamic Scheduling Model for Curtain Wall Production Considering Construction Planning Reliability. Journal Of Cleaner Production, 286.

View Publication

Abstract

Appropriate production scheduling of curtain wall systems is essential for the successful completion of construction projects. The construction process of the curtain wall system is mainly on the critical path and accounts for 10-15% of the total construction cost. Should curtain wall products not be timeously delivered to the construction site, construction projects are likely to fall behind schedule with most relevant activities on curtainwall installation on a critical path. However, due-date uncertainty caused by a contractor's lack of planning reliability causes the curtain wall production schedule to become complex and changes the due date after the initial order. In this regard, this study proposes a discrete event simulation-based dynamic scheduling model for curtain wall production to deliver products on time to the construction site by considering each construction project's planning reliability. Through simulation experiments, the validity and effectiveness of the proposed model were tested. The results of this study will help the successful completion of construction projects by ensuring the progress of the curtain wall system construction and follow-up activities following the construction schedule. (C) 2020 Elsevier Ltd. All rights reserved.

Keywords

Construction Industry; Discrete Event Simulation; Dynamic Scheduling; Production Control; Production Planning; Project Management; Reliability; Scheduling; Walls; Construction Planning Reliability; Construction Schedule; Curtain Wall System Construction; Construction Project; Discrete Event Simulation-based Dynamic Scheduling Model; Curtain Wall Production Schedule; Curtain Wall Installation; Curtain Wall Products; Total Construction Cost; Critical Path; Production Scheduling; Off-site Construction; Demand Variability; Job Shops; Precast; Minimize; Number; Curtain Wall; Simulation; Planning Reliability; Dispatching Rule